USA, Pasadena, CA, Caltech Millikan Library | Objekts | Caltech Millikan Library Basement | | Tehnoloģijas | Tvertņu un cauruļu hidroizolācija Pamatu iekšējā hidroizolācija Pamatu ārējā hidroizolācija | | Apraksts | Condition was total remodel of the basement under the library tower. There were also tiled plaza decks over part of the basement. Mature trees and poured walks surrounded the area so excavation was not possible for positive side waterproofing. In addition, the plaza decks had finished tiles installed, making the cost of positive side waterproofing prohibitive. The method used was to first sandblast the basement walls and ceiling. Then the KOSTER NB 1 System was applied to the walls and ceiling areas under the plaza decks on the negative side. Approximate area is 660 sq. meters.
| | Izmantotie produkti | KÖSTER NB 1 Grey KÖSTER SB Bonding Emulsion "Concentrate" | | Izpildītājs | Troyer Contracting Co., Santa Fe Springs, CA |
|
|