Projekti - pēc hidroizolācijas tehnoloģijām

Izvēlies tehnoloģiju:
Izvēlies projektu: Latvia, Riga, Railway bridge "Gogola"
Bulgaria, Channel
Bulgaria, Kozlodui, Atomic power plant
China, Hong Kong, Cheung Ching Tunnel
Cyprus, Kaya Artemis Hotel
Netherlands, Dortrecht, Trust Computer Supplies
Netherlands, The Hague, SDU Publishers
Poland, Krakow, Apartment Building
Poland, Krakow, Apartment House
Poland, Krakow, Hotel+Restaurant Koscivszko
Poland, Zgierz, Sewage treatment plant
Serbia, Pecinci; Sugar Refinery, 'Donji Srem'
Turkey, Izmir, windmill
Turkey, Side, Sensimar Resort & Spa
United Arab Emirates, Dubai Marina, KG Tower
Belgien, Brüssel, Zentrum der Regionen
Dänemark, Kopenhagen, Gefion Springbrunnen
Deutschland, Berlin, Kunstwerkstätten Rosel
Deutschland, Donauwörth-Asbach, Fendt Traktorenwerk
Deutschland, Landolshausen, Dorfgemeinschaftshaus
Deutschland, Leipzig, Runde Ecke
Deutschland, Northeim, Mehrfamilienhaus
Niederlande, Hoofddorp, Monument und Wohnung des ehemaligen Bürgermeisters
Croatia, Zagreb, GREEN GOLD
Cyprus, Middle East Technical University Campus
Cyprus, Noah's Ark Hotel
Germany, Leipzig, Runde Ecke (round corner)
India, Mumbai, Nirlon Knowledge Park
Portugal, Universidade Catolica in Viseu
Turkey, Antakya, Ottoman Palace Thermal Hotel
Turkey, İzmir, Optimum Shopping Center
United Arab Emirates, Dubai, Holiday Inn Al Barsha Hotel
Polska, Borek Wielkopolski, Rafineria biopaliw
Polska, Kraków, ul. Lipińskiego, Budynki mieszkalne
Polska, Zgierz, Oczyszczalnia Ścieków
Portugal, Santarém, Air BP

Bulgaria, Channel

Picture 1 - View of a part of the channel

Picture 2 - Cross section of a part of the channel Picture 3 - Original design of the joint with a joint filler installed on the water side.
Picture 4 - Divers getting ready to carry out the joint repair in the channel. Picture 5 – Result: successfully waterproofed joint. KÖSTER KB-Pur Gel has waterproofed the joint profile as intended.

Objekts The channel of an energy producing plant 
Tehnoloģijas Savienojumu hermetizācija
 
Apraksts The joints of a channel (picture 1 and 2) made of concrete were leaking. This lead to a substantial loss of water from the channel. Destabilisation of the channel structure due to wash out effects was feared. The joints (picture 3) were leaking because the lifespan of the joint filler which had been used was over. The joint filler had been installed during the construction of the channel. It was the objective of the repair to stop the loss of water through the leaking joints. Repair of the joints had to be carried out under continued operation of the channel. KÖSTER Bulgaria designed together with the technical department of KÖSTER BAUCHEMIE a solution. The design included removal of the old joint filler, installation of a rubber joint profile and injection of KÖSTER KB-Pur Gel around the joint profile using customized injection equipment in order to seal the joint profile into the concrete. This repair concept was suitable to be carried out by divers so that the operation of the channel did not have to be interrupted. Trials were carried out in 2008 which were found to be successful (picture 5) before large scale repair of the joints started in 2009 (picture 4) 
Izmantotie produkti KÖSTER KB-Pur® Gel